At Surface we have established a robust quality system that ensures projects are delivered to the specified design criteria. Our Project Managers and Site Superintendents engage in extensive preconstruction planning meetings to ensure that our prosed execute plan in realized once we reach site.
PUMP STATION CONSTRUCTION – Taylor, British Columbia
[
Subsurface Construction Corporation was retained to supply and install numerous pipe piles from 8” in diameter to 16” in diameter. These foundations were required to support pump station infrastructure for a site near Taylor, BC.
]
Owner
Confidential – Midstream Client
Equipment
- Junttan PM22x Tracked Hydraulic piling machine
- Case 621F Wheel Loader
Location
Taylor, British Columbia