BRIDGE CONSTRUCTION – Bloodvein, Manitoba

[

Subsurface Construction Corporation was retained to provide specialty marine piling support to a general bridge contractor working in Northern Manitoba.

 

]

Scope of Work

The Bradbury River Bridge Project involved the construction of two bridge abutments and an expansive work trestle. Specific Components of this project included but are not limited to:
  • Installation of Seven (7) instream piers
  • Construction of (2) new abutments
  • Welding and installation of caps
  • Welding and installation of girders
  • Launching each span and Bridge assembly
  • Installation of battered and vertical piles for permanent bridge

Owner

Manitoba East Side Road Authority

Equipment

  • 150Ton Linkbelt Crane
  • Delmag Diesel 30-32 Hammer
  • Flying Box Leads
  • 966 Caterpillar Loader
  • 325 Caterpillar Excavator
 

Location

Northern Manitoba, Bloodvein First Nation